Conformity assessment procedures for lifts (modules)

A lift’s conformity is assessed by one of the procedures in Art. 10 of the Bulgarian lifts essential-requirements ordinance: EU-type examination (module B) or an approved quality system, followed by final inspection, module E or module D; unit verification (module G); or full quality assurance plus design examination (module H1). Safety components are assessed under Art. 9.

In this article
  1. Which procedures apply to lifts
  2. Table of lift modules
  3. What the notified body checks under each module
  4. Procedures for safety components for lifts
  5. How to choose a procedure

Which procedures apply to lifts

The Ordinance on the Essential Requirements and Conformity Assessment of Lifts and Safety Components for Lifts transposes Directive 2014/33/EU and lists the procedures in Art. 10(1):

  1. for lifts designed and manufactured to a model lift that has passed EU-type examination (module B): final inspection, module E or module D;
  2. for lifts designed and manufactured under an approved quality system under Section V of Annex 4: again final inspection, module E or module D;
  3. unit verification (module G);
  4. full quality assurance plus design examination (module H1).

Where the party responsible for design and manufacture differs from the party that installs and tests the lift, the former supplies the latter with all documents needed for correct and safe installation and testing (Art. 10(2)).

Table of lift modules

The Directive and the Bulgarian ordinance number their annexes differently. The table shows how the two numberings match.

ProcedureModuleDirective annexBulgarian ordinance
EU-type examination of liftsBIV, Part BAnnex 4, Section I
Final inspection–VAnnex 4, Section VI
Product quality assuranceEXAnnex 4, Section III
Production quality assuranceDXIIAnnex 4, Section II
Unit verificationGVIIIAnnex 4, Section IV
Full quality assurance plus design examinationH1XIAnnex 4, Section V

What the notified body checks under each module

  • Module B. The body examines the technical design of a model lift and a representative sample of a complete lift. The sample must include the loading landings and serve at least three levels – top, middle and bottom (Annex 4, Section I, points 1–2). If successful, an EU-type examination certificate is issued. The body keeps a copy and the documentation for 15 years (point 6).
  • Final inspection. Documents are checked and the lift is tested: operation empty and at maximum load, functioning of the safety components including on power failure, and a static test at 1.25 times the rated load. The body then checks for deformation or wear (Annex 4, Section VI, point 3.3). It issues a final inspection certificate and fills in the lift logbook (point 4).
  • Module G. The body reviews the technical documentation and the lift. Tests include at least those of final inspection, and the result is a certificate of conformity (Section IV, point 4).
  • Module E. The body assesses the installer’s quality system for final product inspection and testing (Section III).
  • Module H1. The quality system for design, manufacture, assembly, installation, inspection and testing is assessed, and where appropriate the lift design (Section V). The Directive provides for periodic audits and possible unannounced visits (Annex XI).

Procedures for safety components for lifts

For the safety components listed in Annex 1, Art. 9 allows three routes:

  • EU-type examination (module B, Annex 3, Section I = Directive Annex IV, Part A), followed by conformity to type with random checking (module C2, Annex IX);
  • module B followed by product quality assurance (module E, Annex VI);
  • full quality assurance (module H, Annex 3, Section IV = Annex VII).

ESTIMA KM is notified for module H (Annex VII) for all types of safety components in Annex III, and for module B (Annex IV, Part A) and module C2 (Annex IX) only for devices to prevent falls (Annex III, point 2). For the other types, module B, and for all types, module E (Annex VI), can only be carried out by another notified body. More in our article on safety components.

How to choose a procedure

  • A one-off lift to an individual design – can be assessed under module G, with no prior type examination (Art. 10(1)(3)).
  • A series of lifts to one model – module B for the model, then final inspection of each lift, or module E or D for the quality system. All permitted variants are described with maximum and minimum values (Art. 10(3)).
  • An installer with its own design and a certified quality system – module H1.

On every route, the notified body’s number follows the CE marking in the car (Art. 13(6)). Each application goes to one notified body only. Certificates issued under the previous rules (Directive 95/16/EC) remain valid (§ 5(3) of the Transitional and Final Provisions; Art. 44 of the Directive).

To apply under one of our procedures, see notified body No. 1829 or write to us via ESTIMA KM offices.

Need conformity assessment for a lift?

Call or write to us.

Sofia: +359 2 951 54 53 Notified Body 1829

Write to office@estimakm.com

Sources

This article is for information and does not replace the text of the legal act.

Frequently asked questions

Can a lift be certified without type examination?

Yes – through unit verification (module G) or full quality assurance plus design examination (module H1) (Art. 10(1)(3) and (4) of the ordinance).

What load is used for the static test at final inspection?

1.25 times the rated load (Annex 4, Section VI, point 3.3(c)).

How many levels must the module B sample lift serve?

At least three – top, middle and bottom (Annex 4, Section I, point 2(d)).

If a notified body refuses a final inspection certificate, can I go to another body?

No. A new application for final inspection or unit verification goes to the same notified body (Annex 4, Section VI, point 4 and Section IV, point 4).