Additional lift inspection in Bulgaria: when is it required

An inspection outside the periodic schedule is required after reconstruction, after a shutdown of more than 6 months before the maintenance company changes, after replacing main components and safety devices, after an accident or incident, and at the user's request (Art. 24(1)(3)–(8) of the Ordinance on the Safe Operation and Technical Supervision of Lifts). In the first three cases the user notifies the supervision body within 7 days (Art. 24(3)).

In this article
  1. When is an additional lift inspection carried out
  2. What is the deadline for notifying the supervision body
  3. Reconstruction or repair: what is the difference
  4. What happens after an accident or incident
  5. Unannounced inspections by GD IDTN

When is an additional lift inspection carried out

The Ordinance on the Safe Operation and Technical Supervision of Lifts (hereafter “the Ordinance”) does not use the word “additional” (извънреден). It lists the types of technical inspection in Art. 24(1); those outside the periodic schedule are:

TriggerWhat the user attaches to the requestLegal basis
ReconstructionThe documents from the person who carried out the reconstruction (§ 1a(2) of the Supplementary Provisions)Art. 24(1)(3); (4)
Shutdown of more than 6 months before the maintenance company changes—Art. 24(1)(4)
Replacement of the lifting machine, traction sheave, hydraulic jack, suspension ropes and their fixings, overspeed governor or safety gearQuality documents for the replaced parts; declaration of conformity for replaced safety componentsArt. 24(1)(5); (5)
Accident or incident—Art. 24(1)(6)
At the user's request—Art. 24(1)(8)

All of these are carried out on the user's written request within two weeks of its receipt by the body the lift is registered with (Art. 24(2)), in the presence of the user and the maintenance company or the person who did the repair or reconstruction (Art. 25(1)).

What is the deadline for notifying the supervision body

After a reconstruction, a shutdown of more than 6 months before a change of maintenance company, or replacement of the listed main components, the user must notify the technical supervision body within 7 days of the event (Art. 24(3)). Separately, the user notifies the maintenance company of a reconstruction it did not carry out itself, and before the lift is put back into service after a repair or reconstruction (Art. 13a(1)).

A missed inspection has consequences: the maintenance company must notify the user in writing and must not allow operation of a lift that has not had a technical inspection under Art. 24(1) (Art. 7a(3)), and the Chief Directorate “Inspection for State Technical Supervision” (GD IDTN) orders it to be stopped (Art. 30(1)(4)).

Reconstruction or repair: what is the difference

The distinction decides whether an inspection under Art. 24(1)(3) is needed. Under the Ordinance:

  • reconstruction (преустройство) is a change to the rated load, travel height, car mass or speed; a change to the structure of the shaft or machine room; a change to the electrical control circuit or its elements; or replacing a safety component with one of different technical characteristics (§ 1(3) of the Supplementary Provisions);
  • repair (ремонт) is replacing a main component — lifting machine, car, control panel, etc. — with an original part, or replacing a safety component with one of the same technical characteristics (§ 1(6) of the Supplementary Provisions).

Whoever reconstructs the lift assesses the risks and gives the user an explanatory note, the technical documentation, quality certificates for materials and components, and a declaration that the reconstruction meets the essential requirements (§ 1a of the Supplementary Provisions). After a repair, the company notifies the body that registered the lift and provides the drawings, quality documents and declarations for replaced safety components (Art. 9(7)); outside the cases under Art. 24(3), the body checks the lift within 15 days of receiving them (Art. 28a). More in Lift reconstruction and modernisation.

What happens after an accident or incident

  1. The user immediately notifies the regional office of GD IDTN and, until its officers arrive, takes measures to help the injured and to stop the accident developing (Art. 32(1)).
  2. The scene is left unchanged until GD IDTN officers arrive, provided this creates no further danger (Art. 32(2)).
  3. GD IDTN investigates the causes and draws up a report (Art. 33).
  4. A technical inspection after the accident or incident is carried out (Art. 24(1)(6)).

Unannounced inspections by GD IDTN

Unannounced inspections (Art. 24(1)(7)) are not requested by the user. Only GD IDTN carries them out — for example when periodic inspection deadlines have passed without a request, when investigating accidents, on complaints and reports, or when previous inspections show signs of developing defects (Art. 24(6)).

ESTIMA KM Ltd, licensed technical supervision body (licence No. 417), carries out the inspections under Art. 24(1)(3)–(6) and (8). Send a request via ESTIMA KM offices or see technical supervision of lifts.

Need a lift inspection?

Call or write to us.

Sofia: +359 2 951 54 53 Lifts Work out the date

Sources

This article is for information and does not replace the text of the legal act.

Frequently asked questions

Must I notify the supervision body when the suspension ropes are replaced?

Yes. Replacing suspension ropes is one of the cases under Art. 24(1)(5): the user notifies the supervision body within 7 days (Art. 24(3)) and requests an inspection, attaching the quality documents for the ropes (Art. 24(5)).

Can I request an inspection without a specific reason?

Yes. The Ordinance provides for an inspection at the user's request (Art. 24(1)(8)), carried out within two weeks of the request (Art. 24(2)).

Is an inspection needed if the lift was out of service for a few months?

The Ordinance requires an inspection after a shutdown of more than 6 months when the person maintaining the lift then changes (Art. 24(1)(4)).

We replaced the overspeed governor with the same model. Is that a reconstruction?

Replacing a safety component with one of the same technical characteristics is a repair (§ 1(6) of the Supplementary Provisions), but replacing an overspeed governor in itself requires a technical inspection (Art. 24(1)(5)) with a declaration of conformity for the new device (Art. 24(5)(2)).