In this article
Who is the user of a lift
The Ordinance on the Safe Operation and Technical Supervision of Lifts (hereafter “the Ordinance”) places the duties on the user (ползвател). For lifts in buildings under condominium ownership (етажна собственост), they are performed by the manager or the chair of the management board of the condominium (§ 1b of the Supplementary Provisions). The user must ensure that the lift is operated in line with the Ordinance and the manufacturer's operating instructions (Art. 4(1)).
Which deadlines must the user meet
| Duty | Deadline | Legal basis |
|---|---|---|
| Registering a new lift | 20 days after the declaration of conformity is issued | Art. 20(1) |
| Notifying a change of user (by the new user) | 10 days | Art. 23 |
| Notifying a reconstruction, a shutdown of over 6 months before a change of maintenance company, replacement of main components | 7 days | Art. 24(3) |
| Presenting the inspection logbook when the maintenance company changes | 7 days | Art. 29(2) |
| Notifying GD IDTN when the lift is scrapped, dismantled or taken out of operation | 10 days | Art. 30(4) |
| Notifying GD IDTN of an accident or incident | Immediately | Art. 32(1) |
| Written request for a fluid cleanliness check (hydraulic lifts) | Once a year | Art. 13a(2) |
GD IDTN is the Chief Directorate “Inspection for State Technical Supervision” of the State Agency for Metrological and Technical Supervision (DAMTN (State Agency for Metrology and Technical Surveillance)). The periodic technical inspection is requested in writing by the user — the first 24 months after putting into service, then every 12 months (Art. 24(1)(2) and (2)). Details in How often must a lift be inspected.
Work out the date with the inspection date calculator.
The maintenance contract: what is up to the user
- The user concludes a written contract for maintenance, repair and reconstruction only with persons entered in the register under Art. 36(1) of the Technical Requirements for Products Act (TRPA), and may change them at any time (Art. 7(1)).
- Without a maintenance contract the lift may not be operated (Art. 7(2)).
- If the lift is maintained, repaired or has been reconstructed by an unregistered person, the user must stop using it immediately (Art. 7(3)).
- These requirements do not apply if the user is itself registered as a lift maintenance company (Art. 7(4)).
How maintenance works in practice: Lift maintenance: contract, checks and records.
Day-to-day duties in the building
- the machine room is kept locked (Art. 13);
- the keys to the machine room and pulley room are kept permanently in the building and used only by the maintenance company and the supervision bodies (Art. 13a(3));
- the emergency service is given access for rescuing people (Art. 13a(4));
- the maintenance company is told of any reconstruction done by someone else, and before the lift is put back into service after a repair or reconstruction (Art. 13a(1));
- if the instruction notice in the car is missing or damaged, the maintenance company is told immediately (Art. 12a);
- no pipes, cables or installations that are not part of the lift are allowed in the shaft or machine room (Art. 14);
- the inspection logbook is kept and shown on request (Art. 29(1) and (3)), and the lift's file is kept until the lift is scrapped (Art. 31).
Safety upgrades for existing lifts
Chapter Five of the Ordinance requires users of existing lifts that lack the relevant equipment to provide:
- a load control device, or a door limiting the usable car floor area with a safety device (Art. 38);
- emergency lighting in the car, shaft lighting, and emergency stop devices on the car roof, in the pit and in the pulley room (Art. 39(1));
- an emergency alarm device with a two-way voice link to the emergency service (Art. 39(2));
- a toe guard under the car (Art. 40).
The deadlines in § 12 of the Transitional Provisions of Council of Ministers Decree No. 62/2014 expired between 31 December 2015 and 31 December 2023 (the last one for the toe guard in residential buildings). If the measures are not in place, the user and the maintenance company must stop the lift and notify GD IDTN (§ 12(2)).
ESTIMA KM Ltd, licensed technical supervision body (licence No. 417), registers lifts and carries out their technical inspections. See technical supervision of lifts or get in touch via ESTIMA KM offices.
Sources
- Ordinance on the Safe Operation and Technical Supervision of Lifts — Art. 4, Art. 7, Art. 12a, Art. 13, Art. 13a, Art. 14, Art. 14a, Art. 20, Art. 23, Art. 24, Art. 29, Art. 30, Art. 31, Art. 32, Art. 38–40; § 1b of the Additional Provisions; § 12 of the Transitional Provisions of CoM Decree No. 62/2014
This article is for information and does not replace the text of the legal act.